The
American Spirit backs to the CN dock at Duluth.
Duluth, Apr 5 2007, Image 07-0015
The
American Spirit waits beneath the loading shuttles at the CN ore dock in Duluth.
Duluth, Apr 5 2007, Image 07-0158
The
Spirit will load approximately 60,000 tons for Great Lakes Steel's Zug Island mill.
Duluth, Apr 5 2007, Image 07-0164
Loading taconite at Duluth's CN ore dock.
Duluth, Apr 5 2007, Image 07-0197
Captain Dan Bartels, Relief captain on
American Spirit.
Duluth, Apr 5 2007, Image 07-0010
Wheelsman Tom McClintock keeps an eye on the ship's unloading boom.
Duluth, Apr 5 2007, Image 07-0098
2nd Assistant Engineer Rick McEwan in the engine control room.
Rick worked for both M. A. Hanna and Interlake when the vessel was the
George A. Stinson before ASC took ownership of the vessel and renamed it the
American Spirit.
Duluth, Apr 5 2007, Image 07-0140