Inland Mariners logo / link to home page
Banner image: AK Steel, Dearborn
Deckhand
At at time when most people are asleep a deckhand drops down onto the dock around 4 in the morning
as the Jackson arrives at AK Steel's Dearborn Works dock on the Rouge River.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0055
Deckhand
A deckhand waits his turn to take the bosun's chair, watching what appears to be
the ghostly figure of the next man to be landed on the dock.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0056
Vent flame
Arrival at the Rouge in darkness is like entering the forge of the gods.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0065
Jackson at dock
The sun is just coming above the horizon as the Jackson ties up to the dock.
Once the ship is in the right location on the dock the unloading will start.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0068
Sunrise on the Rouge
The contrast created by the morning sky shows a world of steel pipes, trusses and conveyors.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0070
Sunrise on the Rouge
Looking forward at the Jackson at the dock.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0080
Unloading
The ore loaded in Marquette is unloaded onto the storage pile.
It takes about five hours for the crew to empty the boat.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0078
Unloading
A horizon full of minaret shaped smokestacks rise above the roofline of an building from an older era.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0112
Blast furnace
Blast furnace shapes from the dockside.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0114
Unloading
The ship's unloading boom holds the conveyor belt carrying the
iron ore from the cargo hold and out onto the storage pile
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0133
conveyor belt
The ship's unloading boom holds the conveyor belt carrying the
iron ore from the cargo hold and out onto the storage pile.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0132
conveyor belt
The conveyorman checks the flow of pellets from the Jackson onto the storage pile.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0106
cargo hold
A shrinking pile of iron ore means the cargo hold will be empty soon.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0084
Herbert C. Jackson
The Herbert C. Jackson backing into the turning basin after delivering 22,643 GT of iron ore.
AK Steel's Dearborn Works, Oct 26, 2015, Image 15-0119