loads at Midwest Energy.
The vessel's loading plan is marked on the shiploader to ensure the load is followed accurately.
Loading a split cargo of coal for Detroit Edison's St. Clair plant, and Consumers Power's Essexville plant.
Superior, WI, Sep 1, 2008, Image 08-8070
Pat Shaul of Midwest Energy, controls the flow and positioning of the coal with a remote control unit.
Superior, WI, Sep 1, 2008, Image 08-8054
A sleeveless Pat Shaul enjoys a rare warm September day at Superior.
Superior, WI, Sep 1, 2008, Image 08-8065
Looking port to starboard at the loading.
Superior, WI, Sep 1, 2008, Image 08-8061
Al Eilers, a recent maritime academy grad, supervises the loading on deck.
Superior, WI, Sep 1, 2008, Image 08-9415
Venerable mariner Jon Watson.
Superior, WI, Sep 1, 2008, Image 08-9417
3:45 p.m. - Another vessel arrives alongside to take the place of the Indiana Harbor at the coal dock.
Superior, WI, Sep 1, 2008, Image 08-8818
4:05 p.m. - Captain Yowell notifys the harbor master that his ship is ready to depart.
Superior, WI, Sep 1, 2008, Image 08-8136
4:25 p.m. - The
Indiana Harbor outbound, approaching the Blatnik Bridge.
Superior, WI, Sep 1, 2008, Image 08-8164
4:35 p.m. - Fleet mate Walter J. McCarthy Jr. waits at the Murphy Fuel dock for its turn at the shiploader.
Duluth, Mn, Sep 1, 2008, Image 08-8199
4:55 p.m. - Lined up with the Duluth Ship Canal, the
Indiana Harbor proceeds toward the Aerial Lift Bridge.
Duluth, Mn, Sep 1, 2008, Image 08-8246
5:05 p.m. - Outbound at the Duluth piers.
Duluth, Mn, Sep 1, 2008, Image 08-8273
The South Breakwater Outer Light at Duluth entered service in 1910. The tower is 37 feet tall.
Duluth, Mn, Sep 1, 2008, Image 08-8280
Duluth's South Breakwater Outer Light entered service on Sep 1, 1901, 107 years to the day this image was taken.
Duluth, Mn, Sep 1, 2008, Image 08-8294