Bow thruster tunnel
Bow thruster tunnel on Indiana Harbor
Superior, March 14, 2013, Image 13-6383

Bow thruster tunnel
Steel grate protecting thruster tunnel on Indiana Harbor
Superior, March 14, 2013, Image 13-6381

Bow thruster tunnel
Northern Engineering crew working on thruster bearing and blades
Superior, March 14, 2013, Image 13-6371

Jeff Lowney
Foreman Jeff Lowney, Northern Engineering
Superior, March 14, 2013, Image 13-6378

Josh Gault
Mechanic Josh Gault, Northern Engineering
Superior, March 14, 2013, Image 13-6372

Peter Norick
Mechanic Peter Norick, Northern Engineering
Superior, March 14, 2013, Image 13-6375

Tony Ball
Tony Ball of Compass Water Solutions works on installing new oily water separator content monitor
Superior, March 14, 2013, Image 13-6325

Tony Ball
Tony Ball of Compass Water Solutions works on installing new oily water separator content monitor
Superior, March 14, 2013, Image 13-6326

Bruce Brown
Bruce Brown replacing bearing on ship's power generator
Superior, March 14, 2013, Image 13-6320

Eric Muller
Eric Muller, owner of Great Lakes Conveyor Belt of Rogers City splices a seam on the cargo hold belt
Superior, March 14, 2013, Image 13-6327

Kevin Muller
Kevin Muller works with his brother Eric on the Indiana Harbor's new cargo hold belt.
This is the first replacement belt for the ship - 2,250' x 9.5' and weighing 60 tons.
Superior, March 14, 2013, Image 13-6327

Vulcanizing press
Vulcanizing press sealing seam on cargo hold belt.
The press reaches a maximum temperature of 300 degrees when vulcanizing
Superior, March 14, 2013, Image 13-6327

Vulcanizing press
It takes about 55 minutes to vulcanize each seam
Superior, March 14, 2013, Image 13-6334