St. Clair rounding Connor's Point.
December 28, 2008, Image 08-9977

Tug
North Carolina heads into the shipyard ahead of the
St. Clair.
December 28, 2008, Image 08-9990
St. Clair backing down Howard's Pocket toward Fraser Shipyard
December 28, 2008, Image 08-9994
North Carolina clearing area along berthing slip at Fraser Shipyard
December 28, 2008, Image 08-0010

The
St. Clair backing inside the shipyard at Superior.
December 28, 2008, Image 08-0048

The
Kentucky rides along beneath the
St. Clair's bow.
December 28, 2008, Image 08-0043

The
St. Clair edges its way toward it lay-up berth at Fraser
December 28, 2008, Image 08-0062

Fraser Shipyard provides a low-tech solution to clear ice out of the way
for the
St. Clair arriving for lay-up.
December 28, 2008, Image 08-0129

The tug
Kentucky flushes ice from alongside the hull of the
St. Clair so it can reach the dock.
December 28, 2008, Image 08-055

Ice chunk in Howard's Pocket
December 28, 2008, Image 08-0129

The
Indiana Harbor arriving off the Duluth entry for winter lay-up.
December 28, 2008, Image 08-0141

The
John G. Munson in the East Basin heading for Graymont with a load of coal.
December 28, 2008, Image 08-9932

The
Great Lakes Trader spends a long day trying to load frozen taconite at Duluth's CN ore dock.
December 28, 2008, Image 08-9896